Abstract

Abstract A multistage Bayesian acceptance sampling model for a serial production process, which incorporates multiple-type defects that may occur in each stage of the process is proposed. A subproblem heuristic to solve for near optimal multistage multiattribute acceptance sampling plans is also developed. The performance and sampling characteristics of the multistage model and the solution heuristic are illustrated and compared to a set of independent single stage plans and a final stage composite plan, showing considerable differences.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.