Abstract

This paper presents a real-time simulation-optimization operation procedure for determining the reservoir releases at each time step during a flood. The proposed procedure involves two models, i.e., a hydrological forecasting model and a reservoir operation model. In the reservoir operation model, this paper compares two flood-control operation strategies for a multipurpose multireservoir system. While Strategy 1 is the real-time joint reservoir operations without using the balanced water level index (BWLI) method, Strategy 2 involves real-time joint reservoir operations using the BWLI method. The two strategies presented are formulated as mixed-integer linear programming (MILP) problems. The idea of using the BWLI method is derived from the HEC-5 program developed by the US Army Corps of Engineers. The proposed procedure has been applied to the Tanshui River Basin system in Taiwan using the 6 h ahead forecast data of six typhoons. A comparison of the results obtained from the two strategies reveals that Strategy 2 performs much better than Strategy 1 in determining the reservoir real-time releases throughout the system during flood emergencies in order to minimize flooding, while maintaining all reservoirs in the system in balance if possible. Consequently, the proposed model using the BWLI method demonstrates its effectiveness in estimating real-time releases.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.