Abstract

This paper focuses on a lot merging-splitting problem in a semiconductor wafer fabrication facility in which a relatively large number of wafer types are produced according to orders with different due dates. In the fab, two or more lots can be merged into a single lot if routes and all processing conditions of the lots are the same for a number of subsequent operations, and the merged lot is split into the original lots at the point where the routes or processing conditions become different. We suggest lot merging-splitting algorithms to reduce the total tardiness of the orders and the cycle times of the lots. The suggested algorithms are evaluated through a series of simulation experiments and the result shows that the algorithms work better than a method used in a real fab.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.