Abstract
Wastewater treatment process design involves the optimization of multiple conflicting objectives. The detection of different equivalent solutions in terms of objective values is crucial for designers in order to efficiently switch to the new optimal operation policies if changes in the process conditions or new constraints occur. In this work, the dynamic multi-objective optimization of a municipal wastewater treatment plant model is carried out. The aim is to simultaneously optimize an economic cost term and an effluent quality index. The selected process variables for the optimization are (1) an aeration factor in the aerated tank previous to the clarifier, and (2) an internal recycle flow rate. Their time profiles are approximated using the control vector parameterization technique. To solve the multi-objective problem and find the Pareto front, the NSGA-II algorithm has been used. The simulation of different realistic scenarios which impose operational constraints (e.g., maintenance operations) reveals that, indeed, multiple solutions exist at least in some areas of the Pareto front. It is observed that different control profiles can produce nearly identical results in terms of Pareto solutions. The a priori knowledge of these equivalent solutions for different scenarios provides the decision makers with alternative choices to be adapted to their organizations policies when events altering decision variables bounds or adding new constraints to the process model occur.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.