Abstract

The earliness/tardiness (E/T) case of hybrid flow-shop scheduling problem (HFSP) is an NP hard problem, which is difficult to deal with; however, the existence of the multi-rules relating to the practical production increases the complexity of this problem. How to solve the combinatorial optimisation problem effectively and optimally is still an open issue today. In this paper, the joint scheduling strategy of differential evolution (DE) algorithm and factor space-based multiple rules decision method is used to solve this E/T scheduling problem. Firstly, DE algorithm is used to make global assignment and obtain each job’s process route. Secondly, factor space method is used to describe the scheduling rules in production process; then a scheduling decision method based on variable weight comprehensive function is considered to figure out the jobs’ operating priority in buffer area during the local production assignment between stages; subsequently the starting time of each job can be determined. Finally, u...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.