Abstract

Purpose This study aims to undertake a contextual analysis of project-level building information modelling (BIM) adoption in Nigeria and demonstrate how BIM is applied across different projects in Nigeria. Design/methodology/approach This research generates contextual and holistic understandings of multiple project-level cases of BIM adoption through an interpretive paradigm guided by relativist ontology and subjectivist epistemology. Two models of project-level BIM adoption (ten-factor theory of BIM adoption and strategic-contingent model of BIM adoption) were merged to formulate the BIM adoption assessment scale (BIM-AAS). A qualitative-oriented case study protocol was developed to extract valid and reliable data from external and internal project data based on BIM-AAS features. The extracted data were analysed using the pattern-matching technique and cross-case analysis. Findings The results indicate that there was substantial use of BIM tools and technologies in the projects. All the projects adopted collaborative procurement and team and developed integrated building information models. The use of BIM tools, technologies and processes in the projects was found to be above average. The complexities and expectations levels of the projects compliment the nature of BIM adoption in the projects. Research limitations/implications The BIM-AAS adopted in this research is an excellent example of a project-level BIM adoption analytical tool. It can be assumed in future research. Also, this research contributes to the theory that the level of project complexity and expectations must align with the level of BIM adoption in projects. The study’s findings ratify BIM tools, technologies and processes as the elements of project-level BIM adoption. Practical implications This research substantiates the actual nature and structure of BIM adoption in Nigeria, thereby simplifying the development of initiatives towards BIM adoption in projects and determining the appropriate strategies for BIM implementation and innovation in the Nigerian construction industry. The most important initiative that the Nigerian government can make to drive BIM implementation is the automating of code checking for building rules and regulations in Nigeria. Originality/value Previous studies have only reported cases of project-level BIM adoption using surveys and without a standardised project-level BIM adoption model to guide the analysis. This study is the first to formulate and use BIM adoption models for a uniform, critical and contextual analysis of project-level BIM adoption.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.