Abstract
The City of Columbus, Ohio is implementing a tunnel system to reduce the number of episodes of combined sewer overflows into the Scioto River. The tunnel systems provide relief to the existing Olentangy Scioto Interceptor Sewer. Two new tunnels being implemented are the OSIS Augmentation and Relief Sewer (OARS), in service since July 2017, and the Lower Olentangy Tunnel (LOT) that is planned to be in service in 2025. The performance of these tunnels in respect to high inflow conditions was investigated with the use of the HAST mixed flow model and the OpenFOAM CFD model to determine the magnitude of surges, the possibility of air pocket entrapment, air–water surging, and the consequences of uncontrolled air pocket releases through shafts. Inflows into the systems were obtained from a calibrated collection system SWMM model. Modeling results quantified surging in the tunnel dropshafts and their mitigation from built-in surge control chambers. HAST simulations also pointed to locations where air pockets could form. These results were used in OpenFOAM to determine the effects of uncontrolled air release through the shaft that links the two tunnels. It was shown that proper ventilation at the shaft will mitigate the growth of air phase pressure to damaging levels.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.