Abstract

ABSTRACT: Development of optimal operational policies for large‐scale reservoir systems is often complicated by a multiplicity of conflicting project uses and purposes. A wide range of multiobjective optimization methods are available for appraising tradeoffs between conificting objectives. The purpose of this study is to provide guidance as to those methods which are best suited to dealing with the challenging large‐scale, nonlinear, dynamic, and stochastic characteristics of multireservoir system operations. As a case study, the selected methodologies are applied to the Han River Reservoir System in Korea for four principal project objectives: water supply and low flow augmentation; annual hydropower production, reliable energy generation, and minimization of risk of violating firm water supply requirements. Additional objectives such as flood control are also considered, but are imposed as fixed constraints.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.