Abstract

In this study a multi-objective problem considering uncertainty and flexibility of job sequence in an automated flexible job shop (AFJS) is considered using manufacturing simulation. The AFJS production system is considered as a complex problem due to automatic elements requiring planning and optimization. Several solution approaches are proposed lately in different categories of meta-heuristics, combinatorial optimization and mathematically originated methods. This paper provides the metamodel using simulation optimization approach based on multi-objective efficiency. The proposed metamodel includes different general techniques and swarm intelligent technique to reach the optimum solution of uncertain resource assignment and job sequences in an AFJS. In order to show the efficiency and productivity of the proposed approach, various experimental scenarios are considered. Results show the optimal resources assignment and optimal job sequence which cause efficiency and productivity maximization. The makespan, number of late jobs, total flow time and total weighted flow time minimization have been resulted in an automated flexible job shop too.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.