Abstract

In flexible job shop scheduling problem (FJSP), the collision of bidirectional rail guided vehicles (RGVs) directly affects RGVs scheduling, and it is closely coupled with the allocation of production equipment, which directly affects the production efficiency. In this problem, taking minimizing the maximum completion time of RGVs and minimizing the maximum completion time of products as multi-objectives a dual-resource integrated scheduling model of production equipment and RGVs considering conflict-free routing problem (CFRP) is proposed. To solve the model, a multi-objective improved discrete grey wolf optimizer (MOID-GWO) is designed. Further, the performance of popular multi-objective evolutionary algorithms (MOEAs) such as NSGA-Ⅱ, SPEA2 and MOPSO are selected for comparative test. The results show that, among 42 instances of different scales designed, 37, 34 and 28 instances in MOID-GWO are superior to the comparison algorithms in metrics of generational distance (GD), inverted GD (IGD) and Spread, respectively. Moreover, in metric of Convergence and Diversity (CD), the Pareto frontier (PF) obtained by MOID-GWO is closer to the optimal solution. Finally, taking the production process of a construction machinery equipment component as an example, the validity and feasibility of the model and algorithm are verified.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.