Abstract
Carbon capture utilization and storage (CCUS) is widely recognized as a promising mitigation technology that would significantly reduce carbon dioxide (CO2) emission. This study develops an optimization-based framework for the deployment of CCUS supply chain with economic and environmental concerns. The overall supply chain is optimized based on superstructure method over a 20 years’ time horizon to provide the location and scale of capture and sequestration sites as well as the most efficient CO2 transport routes capable of meeting the reduction target. The resulting problem is a multi-objective mixed integer linear programming (MILP) problem, whose objectives include minimizing total annual cost and environmental impact. The environmental impact is measured by Global Warming Potential (GWP) imposed by the supply chain operation and quantified according to the principles of Life cycle assessment (LCA). ε-Constraint method is implemented to solve the resultant multi-objective model. A realistic case study that addresses the optimal design of the CCUS supply chain needed to meet the reduction target in Northeast China is studied to demonstrate the application of the proposed model. Results obtained provides valuable insights into the addressed problem and guides the decision-maker to adopt more sustainable alternatives in the deployment of CCUS.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.