Abstract

The study of multiobjective optimization problems, such as resources, time limits, and cost based on network planning, can lead to an intelligent construction plan, which is very important for improving the comprehensive benefit of the project. In this article, a multiobjective static network planning optimization (i.e., sNP-RTC) model is proposed to integrate the heuristic local search algorithm and adaptive operation to improve the multiobjective particle swarm optimization (MOPSO) algorithm to solve the comprehensive “resource–duration–cost” optimization problem. The results show that this algorithm can achieve a unified and comprehensive Pareto frontier compared with the genetic MOPSO, providing a new method for solving resource–duration–cost optimization problems. Moreover, a dynamic “resource–time–cost” problem model for dynamic network planning (i.e., dNP-RTC) is presented and applied to improve the multiobjective subgroup algorithm to solve the model in real time after updating the network planning parameters. Compared with the static problem, the model increases the flexibility of problem solving, is more in-line with engineering practice, saves more cost in work scheduling, and has more application value for actual project scheduling.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.