Abstract
In this work we present two new multiobjective proposals based on ant colony optimisation and random greedy search algorithms to solve a more realistic extension of a classical industrial problem: time and space assembly line balancing. Some variants of these algorithms have been compared in order to find out the impact of different design configurations and the use of heuristic information. Good performance is shown after applying every algorithm to 10 well-known problem instances in comparison to NSGA-II. In addition, those algorithms which have provided the best results have been employed to tackle a real-world problem at the Nissan plant, located in Spain.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.