Abstract

The research report in this paper was a result of a recent article by Yelle [8]. He reports computational results using all combinations of four single level heuristic lot sizing rules, which are applied sequentially to a two level problem in a Material Requirements Planning (MRP) environment. To test the impact of the different combinations of these lot sizing rules he employed six different demand patterns for the end-items which range from level demand to demand which is intermittent throughout the planning horizon. In our research we utilized the same data as Yelle and conducted a more extensive analysis by adding (a) two more recent and powerful single level heuristic rules, namely, the least unit cost heuristic and Silver and Meal's least-cost per period heuristic, (b) the very well known single level optimum method of Wagner-Whitin[7], and (c) a multi-level heuristic proposed recently by McLaren and Whybark [4]. The results show a significant improvement in many cases over the best solutions reported by Yelle. Further in this paper, we also provide a much simpler mathematical formulation of the multi-level lot sizing problem than found in the literature. This formulation was advantageously used to determine optimum solutions using IBM's Mathematical Programming System Extended (MPSX) to the aforementioned problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.