Abstract
In this paper, we have developed an integrated production inventory model for two echelon supply chain consisting of one vendor and one retailer. Production rate and demand rate of retailer and customer are time dependent. Idle time cost of the vendor has been considered. Multi-item inventory has been considered. In integrated inventory model average cost has been calculated under limitation on stroge space. Two echelon supply chain fuzzy inventory model has been solved by various techniques like as Fuzzy programming technique with hyperbolic membership functions (FPTHMF), Fuzzy non-linear programming technique (FNLP) and Fuzzy additive goal programming technique (FAGP), weighted Fuzzy non-linear programming technique (WFNLP) and weighted Fuzzy additive goal programming technique (WFAGP). A numerical example is illustrated to test the model. Finally to make the model more realistic, sensitivity analysis has been shown.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Independent Journal of Management & Production
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.