Abstract

This paper discusses with the protective relay technology over the past 25 years has evolved from single-function electromechanical (EM) relays, to static (electronic) relays, and, finally, to digital multifunction relays. A significant number of these multifunction digital relays are being installed on medium-voltage electric power systems within industrial and commercial facilities. As was required in earlier EM and static relay technologies, digital relays also require commissioning and relay-setting verification. This article discusses the unique challenges the user faces in testing and commissioning digital multifunction relays. It also explores the impact on maintenance testing of self-diagnostics, the digital relay's internal capability to check itself for failures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.