Abstract

Recently, the trend in architectural forms has been toward larger and taller building. The building materials, therefore, are getting larger and heavier as well. Typical construction machineries are, however, not adequate for handling these materials and most of the construction works have been still managed by a human operator. Construction processes are, therefore, fraught with a number of problems, including frequent accidents, high construction cost and heterogeneous construction quality; which is depended on the experience of the worker. In various construction sites, automation in construction has been introduced to address these problems. In this paper, the process of a curtain wall construction in the skyscraper is analyzed and proposed the MultiDOF Construction Robot (MDCR) for this construction process. The need of man power can be reduced by using the proposed MDCR, the construction period and cost can be retrenched as well. The MDCR can be assured safety in the curtain wall construction site. The performance of proposed robot system (MDCR) was verified with the real application test in skyscraper construction site.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.