Abstract

Joint production and maintenance scheduling has been widely studied and many solutions have been proposed. However, all proposed solutions consider production tasks as maintenance ones. In fact, these task types have different constraints and can't be planned similarly. In this paper, we propose a new joint production and maintenance scheduling that takes into account human resources availability and skills to propose realistic schedules. Multi Agent Systems are used for modeling the floor shop.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call