Abstract

This paper proposes a multi-timescale operational approach for a three-phase unbalanced distribution system containing hourly scheduling at substation level and minutes power flow operation at feeder level. In the substation scheduling model, the objective is to minimize the system cost with variable renewable generations. The given error distribution model of renewable generation is formulated as a chance constraint and derived into a deterministic form by Gaussian mixture model with genetic algorithm-based expectation-maximization. In the feeder scheduling model, the system cost is further reduced with the optimal power flow (OPF) at a timescale of minutes. Considering the nonconvexity of the three-phase unbalanced OPF problem in distribution systems, the semidefinite programming is used to relax the problem into a convex problem and a distributed computation approach is built based on alternating direction method of multiplier. The IEEE 123-bus distribution system, University of Denver campus distribution system, and the IEEE 8500-bus distribution system are used as the test bench for the proposed approach. The numerical results demonstrate the effectiveness and validity of the proposed method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call