Abstract

This paper develops a multi-stage optimization framework for determining periodic inspection intervals for geo-distributed infrastructure systems subject to hidden failures. We assume that the unit’s failure can only be rectified at periodic inspection when a perfect repair is carried out to restore the unit to as-good-as-new condition. For large-scale systems such as fire hydrants in a city, water supply and power transformer distribution networks in urban areas, firstly, we partition the units of a system into groups based on their pre-specified features by a clustering algorithm; then compute an optimal periodic inspection interval for each group based on the expected cost per cycle; and finally, we find the inspection schedule for the whole system that not only minimizes the total inspection and maintenance cost but also satisfies the workforce and budget resource constraints. An integer nonlinear programming formulation and a heuristics are introduced to determine the inspection schedule. The proposed approach is applied to scheduling periodic inspection of large amounts of fire hydrants in a major U.S. city.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.