Abstract

The integration of energy internet (EI) and electric power system has a profound influence on electric power system planning. Therefore, this paper mainly resolves the EI-oriented multi-stage generation and transmission coordinated planning problem with a modified fireworks algorithm. Firstly, we combined with Stackelberg game theory and focused on subject game theory, system low carbon characteristic and renewable energy generation, a multi-stage generation and transmission coordinated planning model for electric power system is proposed. The model has a main objective function of maximizing the social welfare and two secondary objective functions of maximizing individual profits in the operation stage and maximizing overall profits of generation companies in the planning stage. Then, a modified fireworks algorithm (MFWA) is proposed with good expandability, convergence and adaptability to solve the problem. The MFWA is modified by introducing Gaussian Mutation to improve global search capability. The basic coding method and solution procedure of the MFWA are depicted. Finally, an improved IEEE-24 bus system is used to test the proposed planning method and MFWA. By comparing three scenarios and analysing results, we can verify the validity and feasibility of the proposed method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.