Abstract

In response to the challenges of long crossing distances and difficult site selection for linear engineering projects in mountainous areas, this article proposes a multi-scale engineering geological zoning (EGZ) method. This method is based on the linear engineering construction stage and transitions from regional EGZ to EGZ of key sections (areas with poor or worst engineering geological conditions). This method not only ensures the effect of EGZ but also reduces the workload. When carrying out the EGZ of key sections, the assessment ideas of geological disaster hazards were taken into consideration. An improved method for calculating the time probability and magnitude probability of disaster occurrence is proposed. Taking the National Highway 318 Chengdu-Shigatse section as an example, EGZ was carried out. Its results revealed that the Nyingchi section was the key section with poor and worst engineering geological conditions. EGZ of the key section showed that the areas with poor and worst engineering geological conditions were mainly distributed in the curved sections on the northern side of the linear project. The proposed method in this article provides guidance for EGZ for linear engineering projects in mountainous areas.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call