Abstract

After more than two decades of applying CPM as a planning and scheduling technique there is growing doubt about some of the advantages initially attributed to it. It is being discarded by both large and small construction companies, and its use limited to cases where it is required by the clients. Some planners and schedulers have begun to depend on their own experience. The author has developed a heuristic planning and scheduling model which uses two new criteria: the tightness degree of completion due-dates and resource tightness degrees. Throughout the scheduling experiments, the hypothetical relationship between the performance of the proposed heuristic scheduling rules and the degrees of completion due-dates and resource tightness proved to be correct and there is a significant difference between the performance of proposed heuristic scheduling rules in the different scheduling classes. The new classification of scheduling problems proved to be practical, effective and helpful. The scheduling experim...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.