Abstract
In order to improve our understanding of the large-scale ground failure phenomena caused by old underground mining works, a solution mine was instrumented in 2004 prior to its collapse as part of the mining scheme. A permanent monitoring system was set up, including a high-resolution microseismic network linked to a surface field-displacement measurement system. The large amount of data transmitted for on-line processing provided daily insight into the evolution of the geological system. First, microseismic activity showed upward progressive failure migration throughout 2008 without any significant surface movement. Second, after two days of intensive brine extraction, a high microseismicity and energy release rate marked the failure of a thin and very rigid bed at a depth of 120 m. This failure occurred 24 hours before the final collapse; it was followed by transient brine pressure signals, and by acceleration of the surface subsidence rate, reaching 1 m/h in the final phase.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.