Abstract

This paper presents a Multi-Objective Particle Swarm Optimization (MOPSO) methodology to solve the problem of energy resource management in buildings with a penetration of Distributed Generation (DG) and Electric Vehicles (EVs). The proposed methodology consists in a multi-objective function, in which it is intended to maximize the profit and minimize CO2 emissions. This methodology considers the uncertainties associated with the production of electricity by the photovoltaic and wind energy sources. This uncertainty is modeled with the use of a robust optimization approach in the metaheuristic. A case study is presented using a real building facility from Portugal, in order to verify the feasibility of the implemented robust MOPSO.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.