Abstract
Distributed energy resources DERs are small scale energy system which could provide local supply when placed at customers' premises. They aggregate multiple local and diffuse production installations, consumer facilities, storage facilities and monitoring tools and demand management. The main challenges when assessing the performance of an off-grid hybrid micro-grid system HMGS are the reliability of the system, the cost of electricity production and the operation environmental impact. Hence the tradeoff between three conflicting objectives makes the design of an optimal HMGS seen as a multi-objective optimization task. In this paper, we consider the optimization and the assessment of a HMGS in different Swedish cities to point out the potential of each location for HMGS investment. The HMGS consists of photovoltaic panels, wind turbines, diesel generator and battery storage. The HMGS model was simulated under one-year weather conditions data. A multi objective particle swarm optimization is used to find the optimal system configuration and the optimal component size for each location. An energy management system is applied to manage the operation of the different component of the system when feeding the load. The techno economics analysis shows the potential of HMGS in the Swedish rural development.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.