Abstract

In this paper, a multi-project scheduling in critical chain problem is addressed. This problem considers the influence of uncertainty factors and different objectives to achieve completion rate on time of the whole projects. This paper introduces a multi-objective optimization model for multi-project scheduling on critical chain, which takes into consideration multi-objective, such as overall duration, financing costs and whole robustness. The proposed model can be used to generate alternative schedules based on the relative magnitude and importance of different objectives. To respond to this need, a cloud genetic algorithm is proposed. This algorithm using randomness and stability of Normal Cloud Model, cloud genetic algorithm was designed to generate priority of multi-project scheduling activities and obtain plan of multi-project scheduling on critical chain. The performance comparison shows that the cloud genetic algorithm significantly outperforms the previous multi-objective algorithm.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.