Abstract
Abstract: This paper deals with the train load planning problem arising in seaport terminals. In particular, the train load planning problem in case of two cranes is studied, corresponding to the optimal assignment of containers to the wagons on which they are loaded and to the cranes which perform the loading operations. This optimal assignment is realized by considering the simultaneous optimization of several objectives. Hence, the train load planning problem is formulated as a multi-objective optimization problem and three multi-objective optimization techniques are applied and compared to solve it. Some preliminary experimental results are shown in order to compare the three methods.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.