Abstract
A combined heating and power (CHP) microgrid has high flexibility and economy, but the output of renewable energy is uncertain. Meanwhile, excessive flexible load adjustment in the demand response process will increase user dissatisfaction. In order to solve the above problems, this paper quantifies uncertainty with the conditional value-at-risk (CVaR) of relative disturbance. Additionally, a multi-objective optimal scheduling model that takes into account both the operating economy and the demand-side power consumption satisfaction is established. In order to solve the multi-objective mixed-integer nonlinear programming problem well, we propose an improved sparrow search algorithm (ISSA), which solves the problem that the sparrow search algorithm (SSA) is prone to low accuracy, insufficient in population diversity and easy to be trapped in local optimum. Combined with the non-dominated solution ranking method, ISSA has the ability of multi-objective optimization. Finally, simulation on a typical CHP microgrid is performed. The optimization results under different confidence levels and risk preference coefficients are compared and analyzed. When the risk preference coefficient is 0.1, 2 and 5, the minimum rotating reserve capacity is 75.17 kW, 82.83 kW, and 105.70 kW in the electric part and 40.08 kW, 59.89 kW, and 61.94 kW in the thermal part. The effectiveness of the proposed CVaR of relative disturbance is verified.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.