Abstract
This paper aimed to demonstrate a metaheuristic as a solution procedure to schedule a two-machine, identical parts robotic cell under breakdown. The proposed previous model enabled one to determine optimal allocation of operations to the machines and corresponding processing times of each machine. For the proposed mathematical model to minimize cycle time and operational cost, multi-objective particle swarm optimization (MOPSO) algorithm was provided. Through some numerical examples, the optimal solutions were compared with the previous results. MOPSO algorithm could find the solutions for problems embeds up to 50 operations in a rationale time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: WSEAS TRANSACTIONS ON INFORMATION SCIENCE AND APPLICATIONS
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.