Abstract

This paper introduces a multi-factory scheduling problem with heterogeneous factories and parallel machines. This problem, as a major part of supply chain planning, includes the finding of a suitable factory for each job and the scheduling of the assigned jobs at each factory, simultaneously. For the first time, this paper studies multi-objective scheduling in the production network in which each factory has its customers and demands can be satisfied by itself or other factories. In other words, this paper assumes that jobs can transfer from the overloaded machine in the origin factory to the factory, which has fewer workloads by imposing some transportation times. For simultaneous minimization of the sum of the earliness and tardiness of jobs and total completion time, after modeling the scheduling problem as a mixed-integer linear program, the existing multi-objective techniques are analyzed and a new one is applied to our problem. Since this problem is NP-hard, a heuristic algorithm is also proposed to generate a set of Pareto optimal solutions. Also, the algorithms are proposed to improve and cover the Pareto front. Computational experiences of the heuristic algorithm and the output of the model implemented by CPLEX over a set of randomly generated test problems are reported.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.