Abstract
This paper investigates a multi-objective parallel machine scheduling problem under fully fuzzy environment with fuzzy job deterioration effect, fuzzy learning effect and fuzzy processing times. Due dates are decision variables for the problem and objective functions are to minimise total tardiness penalty cost, to minimise earliness penalty cost and to minimise cost of setting due dates. Due date assignment problems are significant for Just-in-Time (JIT) thought. A JIT company may want to have optimum schedule by minimising cost combination of earliness, tardiness and setting due dates. In this paper, we compare different approaches for modelling fuzzy mathematical programming models with a local search algorithm based on expected values of fuzzy parameters such as job deterioration effect, learning effect and processing times.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.