Abstract

This paper presents a fuzzy extension of the simple assembly line balancing problem of type 2 (SALBP-2) with fuzzy job processing times since uncertainty, variability, and imprecision are often occurred in real-world production systems. The jobs processing times are formulated by triangular fuzzy membership functions. The total fuzzy cost function is formulated as the weighted-sum of two bi-criteria fuzzy objectives: (a) Minimizing the fuzzy cycle time and the fuzzy smoothness index of the workload of the line. (b) Minimizing the fuzzy cycle time of the line and the fuzzy balance delay time of the workstations. A new multi-objective genetic algorithm is applied to solve the problem whose performance is studied and discussed over known test problems taken from the open literature.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.