Abstract

Access to distribution grid for distributed photovoltaic (short for PV),technically,it determines solutions in the economic evaluation method.The method combines with comprehensive scoring method,Access to the distribution grid will be different from each program in economic construction,load flow,voltage,power quality,supply reliability and other aspects .Also the transformation of the distribution grid to rate the degree by the weighted average method that determines each PV access solutions the final performance of grid PV Construction method of the process,mainly AHP through index calculation,the access of PV program is evaluated to determine the economic and technical level access solution.This study will greatly enhance the PV grid security that helps PV in our country to develop PV.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.