Abstract

As the continuous development of integrated energy system and distributed power supply, operation economy and regional energy Internet reliability, especially micro-energy system, are increasing. Therefore, it is necessary to build multi-energy complementary micro-energy system, innovate energy supply mode, realize collaborative and efficient utilization among multi-energy systems, improve energy utilization efficiency and absorb renewable energy. In this paper, the decision model of distribution network planning scheme including distributed generator supply is established from four aspects: investment and operation cost, extra reserve capacity, energy conservation, reliability cost. The decision model involves a lot of parameter calculation and selection judgment, so after the decision goal is determined, an decision framework based on DS-MAS is established, that is, parameters are automatically calculated and selected based on different scenarios. Model validity is proved via a practical decision project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.