Abstract
The park-level integrated energy system (PIES) can realize the gradient utilization of energy and improve the efficiency of energy utilization through the coupling between multiple types of energy sub-networks. However, energy analysis and exergy analysis cannot be used to evaluate the economics of PIES. In addition, conflicts of interest among integrated energy suppliers make the economic scheduling of the PIES more difficult. In this paper, we propose a multi-objective collaborative game-based optimization method based on exergy economics, in which the introduction of exergy economics realizes the economic assessment of any link within the PIES, and the optimization model constructed based on the potential game solves the problem of conflict of interest among multiple energy suppliers and improves the benefits of each supplier. Finally, taking a PIES in Guangzhou as an example, the rationality of the optimization scheme proposed in this paper is demonstrated by comparing it with the classical optimization scheme.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.