Abstract

This paper presents a hybrid metaheuristic algorithm (HMA) for Multi-Mode Resource-Constrained Project Scheduling Problem (MRCPSP) in PERT networks. A PERT-type project, where activities require resources of various types with random duration, is considered. Each activity can be accomplished in one of several execution modes and each execution mode represents an alternative combination of resource requirements of the activity and its duration. The problem is to minimize the regular criterion namely project's makespan by obtaining an optimal schedule and also the amount of different resources assigned to each activity. The resource project scheduling model is strongly NP-hard, therefore a metaheuristic algorithm is suggested namely HMA. In order to validate the performance of new hybrid metaheuristic algorithm, solutions are compared with optimal solutions for small networks. Also the efficiency of the proposed algorithm, for real world problems, in terms of solution quality and CPU time, is compared to one of the well-known metaheuristic algorithms, namely Genetic Algorithm of Hartmann (GAH). The computational results reveal that the proposed method provides appropriate results for small networks and real world problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.