Abstract

Multi-item capacitated lot-sizing involves the determination of production quantities in different periods in the presence of resource constraints. The model presented in this paper includes a setup time for the production of a lot of an item. The production of items in a given period is constrained by a limited regular time and a limited overtime. Moreover, the production level of any item in a given period is also limited. This problem is tackled by a Cross decomposition based algorithm which can provide an optimal solution, or a near optimal solution if computational time is restricted.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.