Abstract

This study aims at improving the multi-floor layout of a card and packet production company based on the Systematic Layout Planning (SLP) method. A detailed study of the facility layout such as its operational processes, flow of materials and activity relationships has been done. Long distance, cross-traffic, and cost have been identified as the major problems of the current multi-floor layout. Three alternative layouts were suggested by SLP and the best alternative was selected and compared with the current layout. The results revealed that the new alternative layout could considerably improve the companys layout problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.