Abstract

A simultaneous optimization of the design and operation of a district heating, cooling and power generation plant supplying a small stock of residential buildings has been undertaken with regards to cost and CO 2 emissions. The simulation of the plant considers a superstructure including a solid oxide fuel cell–gas turbine combined cycle, a compression heat pump, a compression chiller and/or an absorption chiller and an additional gas boiler. The Pareto-frontier obtained as the global solution of the optimization problem delivers the minimal CO 2 emission rates, achievable with the technology considered for a given accepted investment, or respectively the minimal cost associated with a given emission abatement commitment.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call