Abstract

In this study, taking the different parameters into account, different designs of b-type ORC power plant have analytically conducted. In the designs, Simav geothermal resources have been taken into consideration as the source of the plant. Then, the best design has been determined using EATWOS in the viewpoint of the working conditions . As a conclusion, the available models of b1-type , b2-type and b3-type were determined as Model 12, Model 10 and Model 31, respectively for energy efficiency, net yearly electricity generation and integrated-based values. Amongst these, the best model was determined as Model 10 with the design parameters of 353.15 K, 413.15 K, 295.15 K, 656.37 MWh and 18.08 for T 1b , T 2d , T 2c , E net and η, respectively .

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.