Abstract

Workload control is a production planning and control concept designed to meet the need of the make-to-order industry. In this paper, a multi-agent workload control methodology that simultaneously addresses due date setting, job release and scheduling is proposed. To be consistent with just-in-time production, the objective of minimizing weighted job earliness and tardiness is used. Two new rules are developed, by introducing a feedback mechanism, to set job due dates dynamically. These two new rules implicitly include job pool times and, thus, eliminate the need to estimate job pool times in the presence of workload control. At the critical norm defined in this paper job release control can reduce average job flowtime and work-in-process inventory, without worsening earliness and tardiness, and lead-time performances. The proposed methodology is implemented in a flexible job shop environment. The computational results indicate that the proposed methodology is very effective for production planning and control in make-to-order companies. In addition, the proposed methodology is extremely fast and can be implemented in real time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.