Abstract
In manufacturing environments with complex product structures and multiple production stages, material requirements planning (MRP) systems are the most commonly used for production planning and material supply decision making. However, in practice diverse difficulties arise, such as uncertainty in market demand, resources with limited available capacities, uncertainty in capacity data or uncertain costs. Likewise, classical procedures of resolution applied in MRP environments do not optimize production decisions. This paper provides a new linear programming model for medium term production planning in a capacity constrained MRP, multi-product, multi-level and multi-period manufacturing environment. Then, this model is transformed into three fuzzy models with flexibility in the objective function, in the market demand and in the available capacity of resources. The main goal is to determine the master production schedule, the MRP for each raw component in each period, stock levels, delayed demand, and capacity usage levels over a given planning horizon in such a way as to hedge against uncertainty. Finally, the model is tested using real data from an automobile seat manufacturer.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.