Abstract

ABSTRACT This study aimed to provide an experimental evaluation method for train’s moving safety on a post-earthquake bridge. First, an improved real-time hybrid simulation (RTHS) framework was constructed, based on utilizing the moving load superposition algorithm to solve the train-track-bridge interaction (TTBI) problem. An RTHS test was then conducted for the TTBI problem. The train model was tested using a shake table and was dynamically linked to the numerical substructure. A post-earthquake seven-span high-speed railway simply supported bridge was studied, in which earthquake-induced damage, such as stiffness reductions, residual displacements of piers, girder gap expansions, and pier settlements were all tested.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.