Abstract

This paper describes the activity period of an experimental hybrid wetland system placed in a cold climate region. The aim is to determine the efficiency of the system in reducing TSS, BOD 5, COD and other pollutants. The constructed wetland consists of a fat-removal unit and a basin for the storage and the distribution of the wastewater which precedes three phytoremediation beds: the first two are parallel and they work as submerged vertical flow wetland with gravel medium for an area of 180 m 2; the last is a submerged horizontal flow wetland with sand medium and an area of 360 m 2. The CW was designed to process a total estimated BOD 5 loading rate of about 24 g m −2 d −1, which was less than half of the average actual loading rate. The wastewater treatment did not meet the required Italian law outflow limits, most likely due to BOD 5 overloading.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call