Abstract

Reactive power planning is one of the challenges facing an integrated power network to operate efficiently. It requires optimal coordination of all the reactive power sources in the network. In this work, Moth flame optimization (MFO) based algorithm used for optimal location of flexible alternating current transmission system (FACTS) devices. In standard IEEE 30 and IEEE 57 test systems the proposed approach is examined. The static Var compensator (SVC) and thyristor controlled series capacitor (TCSC) are the two FACTS devices used. The load ability of the power system is enhanced by installing FACTS controllers considering both active and reactive loading. The reactive sources are placed optimally which is chosen by considering position and size of FACTS devices. The proposed method with FACTS devices is compared with other recent techniques like Particle swarm optimization (PSO) and gravitational search algorithm (GSA). It is observed that the MFO based approach is better as compared to other methods in terms of loss and the running cost at various loading conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.