Abstract
Abstract In 1994 a major wind power development project was initiated in southwest Minnesota that may eventually produce 425 megawatts (MW) of electricity. The wind plant currently consists of 3 phases that total 354 turbines capable of generating 236 MW. During a study conducted from 1996–1999 to assess effects of wind power development on wildlife, 184 bat collision fatalities were documented within the wind plant. Hoary bats (Lasiurus cinereus) and eastern red bats (L. borealis) comprised most of the fatalities. After correcting bat fatality estimates for searcher efficiency and scavenger removal rates, we estimated that the number of bat fatalities per turbine ranged from 0.07 per y at the Phase 1 wind plant to 2.04 per y at the Phase 3 wind plant. The timing of mortalities, and other factors, suggest that most mortality involves migrant rather than resident breeding bats.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.