Abstract

Nearshore nourishment is a common coastal flood risk management technique that can be constructed beneficially by using dredged sediment from navigation channels. A nearshore nourishment project was completed during the summer of 2021 in Harvey Cedars, NJ, USA, with 67,500 m3 of dredged sediment from Barnegat Inlet placed along approximately 450 m of beach in a depth of 3–4 m. In situ instruments were installed to monitor hydrodynamic conditions before and after dredged material placement, and nine topographic and bathymetric surveys were conducted to monitor nearshore morphological response to the nourishment. Shoreline location was extracted from satellite imagery using CoastSat software to compare historical trends to the shoreline response after construction. Seven months after construction, 40% of the nearshore nourishment was transported from the initial footprint and the centroid of the nourishment migrated towards shore and alongshore (north). The sheltering capacity of the nearshore berm appears to have captured an additional 58% of the placed volume from the longshore transport system and the beach width onshore of the placement increased by 10.9 m. Measured data, satellite imagery analysis, and rapid predictions all indicate that the nearshore nourishment at Harvey Cedars had a positive impact on the adjacent beach.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call