Abstract

In batch process scheduling, the introduction of intermediate storage tanks between process stages result in increasing the efficiency and productivity of the process. The main purpose of this is to minimize the process completion time, i.e. makespan. However, it is important to determine the right number and respective locations of the intermediate storage to ensure optimal investment and operational cost. The generally adopted transfer policies for handling intermediate storage tanks in batch processes are unlimited intermediate storage (UIS) and finite intermediate storage (FIS). In this work, new completion time algorithms for UIS and FIS transfer policies are proposed using matrix representation. The objective of the proposed approach is to calculate the makespan for all possible production sequences for given batch product recipes while at the same time determining the number and location of intermediate storage tanks required. With the assumptions that the intermediate storage could be used to store any intermediate product, the method is verified against the Gantt chart method and the results agreed well. A number of different product recipes are analyzed using a developed computer code. This enables the proposed algorithms to produce solution options for large size batch scheduling problems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.