Abstract

We address a manufacturing environment with the no-wait constraint which is common in industries such as metal, plastic, and semiconductor. Setup times are modelled as uncertain with the objective of minimizing maximum lateness which is an important performance measure for customer satisfaction. This problem has been addressed in scheduling literature for the two-machine no-wait flowshop where dominance relations were presented. Recently, another dominance relation was presented and shown to be about 90% more efficient than the earlier ones. In the current paper, we propose two new dominance relations, which are less restrictive than the earlier ones in the literature. The new dominance relations are shown to be 140% more efficient than the most recent one in the literature. As the level of uncertainty increases, the newly proposed dominance relation performs better, which is another strength of the newly proposed dominance relation. Moreover, we also propose constructive heuristics and show that the best of the newly proposed heuristics is 95% more efficient than the existing one in the literature under the same CPU time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.